
Port Services
Installation of ground fueling infrastructure for multiple RTGs to improve operational efficiency and safety.
DP World
South Container Terminal – Jeddah Islamic Port
Project Year
Client
Location
This project involved the installation of ground fueling lines serving ten Kalmar Rubber Tyred Gantry (RTG) cranes. The scope included precise routing, secure installation, and integration of fueling systems in compliance with port safety regulations. The implemented solution reduced refueling downtime, enhanced operational safety, and supported continuous crane operations within the terminal.

Fuel-grade piping systems
Safety valves and connectors
Pipe supports and mounting accessories
Ground excavation and routing tools
Testing and safety equipment
Ground routing of fuel pipelines
Installation of fueling lines for RTGs
Integration with existing fueling systems
Leak testing and safety verification
Commissioning and operational testing